Crystal Leaf Interface King has super bonding ability, high adhesion, high strength, aging resistance and strong adhesion. Good water resistance, suitable for indoor and outdoor walls and ceilings before painting. Tile surface, calcium silicate board. Interface treatment on wood substrates or smooth surface substrates to minimize or eliminate screed hollowing. falling off, etc. Improve bearing capacity.
Features
+Super strong adhesion, anti-shedding:
+Aging resistance. Good water resistance,
*Non-toxic and harmless, healthy and environmentally friendly.
Construction method
When using the two-component type, just mix the liquid material and the powder material, stir into a uniform paste, and let it stand for 5 minutes. Use a suitable ash knife to spread the good interface agent evenly on the base layer. The base surface must be kept flat and firm. Clean, no dust. Loose parts should be removed, leveled, and pits with a depth greater than 5mm. Apply 425# cement mortar (or commercial mortar) to smooth the wall. The smear thickness is controlled at 2-3mm, 1-3kg per square meter, and the tool is a roller or a brush.
Precautions
1. The construction temperature shall not be lower than 5°C and shall not be higher than 35*C
2. On tile surface renovation↓ or other smooth surface substrates. Tooling smooth-surfaced substrates into pits. to increase adhesion.
3 There should be no floating dust on the substrate. Oil stains and loose residues should be removed, otherwise construction cannot be performed.
Executive standard
JC/T547-2007 standard. ;
Shelf life
Sealed products in barrels and stored on ventilated and dry shelves. Under normal storage (not less than 0'C) shipping conditions. Shelf life is one-year.
Storage conditions
+ Store in a closed container. Store in a cool, ventilated, dry warehouse to prevent direct sunlight ↓ Storage ambient temperature should be kept between 0-35+.
+ Precipitation during storage is normal. Stir well before use.
statement
When the use of this product is beyond the control of the manufacturer, the company does not assume any responsibility for any loss caused by incorrect use, and the construction should be carried out in accordance with the scope of the manual. For any questions, please consult the local distribution point or the company's technical service personnel.